can you put additional epoxy shield on concrete

** Bonus Epoxy Guard: Can Your Concrete Deal With One More Layer? **.


can you put additional epoxy shield on concrete

(can you put additional epoxy shield on concrete)

So your concrete flooring has an epoxy coating. It looks great, secures the surface area. But maybe you’re thinking: is one layer sufficient? Can you add an additional coat for also tougher protection? The short solution is yes, you absolutely can include an added epoxy guard. Yet it’s not constantly easy. Allow’s break it down.

Think about why you desire much more epoxy. Did the very first layer fray in places? Perhaps heavy traffic locations look scraped. Possibly you splashed something awful that tarnished it. Or maybe you simply want that super-thick, glossy, undestroyable appearance. An added layer can fix those points. It adds more shield. It makes the floor more challenging to damage. It can revitalize the color and luster.

Timing matters a lot. Including a second layer works best right after the first. The first epoxy is still treating, still a little bit sticky. This helps the brand-new layer bond firmly. It resembles glue sticking to slightly wet glue. But suppose your epoxy is old? Maybe it’s been down for years. Don’t stress. You can still add another layer. It just takes more prep work. The old surface requires to be perfectly all set for the new epoxy to stick.

Prep work is whatever. Seriously. Miss this action and your brand-new epoxy could peel straight off. It’s unpleasant job, but essential. Initially, tidy the existing epoxy floor completely. Sweep away all dirt and grit. Wipe it well. Make use of a degreaser for any type of oily spots. Allow it completely dry totally. Next, you require to harsh up the smooth surface area. Epoxy holds much better to a slightly textured finish. Get hold of some sandpaper. Usage tool grit. Sand the whole floor lightly. You don’t require to get rid of the old epoxy, just scuff it up. Think of it like creating tiny scrapes for the brand-new coat to get onto. Clean away all the fining sand dirt after. A tack fabric is terrific for this. Any type of dirt left will spoil the bond.

Now, examine the old coat closely. Exist any type of chips or deep scrapes? Load these in initial. Make use of an epoxy patching compound. Smooth it out. Allow it treat totally before adding the general 2nd layer. Look for any glossy, slick locations. These areas resist new epoxy. Sand them additional well. Make sure the whole floor really feels somewhat harsh and dull.

Using the second layer resembles doing the first one once more. Mix your epoxy material and hardener precisely as the guidelines say. Measure carefully. Mix slowly to prevent bubbles. Put the mixed epoxy onto the floor. Spread it quickly with a roller created for epoxy. Use a squeegee for bigger areas initially. Work in convenient sections. Keep a damp side. This suggests always rolling right into the wet epoxy you just applied. It protects against noticeable lines or ridges. Work fast; epoxy collections quickly. Excellent air flow is essential. Open up windows and doors. Use a respirator mask. The fumes are strong.


can you put additional epoxy shield on concrete

(can you put additional epoxy shield on concrete)

Let the brand-new coat remedy undisturbed. Follow the supplier’s time referrals. Typically, light foot website traffic is okay after 24 hours. Wait longer for heavy furniture or vehicles. This added epoxy shield makes your concrete floor a lot tougher. It looks deeper, richer. It fights discolorations and chemicals better. It deals with heavy use without showing wear. Simply keep in mind the preparation work. A well-prepared surface suggests your additional guard bonds perfectly. It becomes one solid, safety layer. Your concrete gets that best defense.

Newsletter Updates

Enter your email address below and subscribe to our newsletter